Laying

Handling guidelines
For correct laying and the avoidance of damage/subsequent damage, our handling guidelines must be adhered to.

Laying info
In addition to the free laying plan, a laying information sheet with all the necessary information is now delivered with each order. With this service we want to avoid any potential uncertainties during laying.

Laying videos
In our laying videos all work steps are comprehensively demonstrated and explained.

Compriband
Due to building physics guidelines we recommend the use of Compribands (for example, from the Bosig) on the wall connection as well as on element joints.

Bosig – Compriband technical specification

Compriband for element joint: Combband 300/2 x 15 mm
Compriband for wall connection: Combband 300/8 x 20 mm

Adhesive tape
For a clean close and problem-free processing phase we recommend the use of our water-resistant adhesive tape.







General processing guidelines

Enke liquid plastics for flat roofs

Vacuum insulation facade - introduction and assembly

Cookie-Einstellungen
Wir verwenden Cookies, um Ihnen ein optimales Webseiten-Erlebnis zu bieten. Dazu zählen Cookies, die für den Betrieb der Seite notwendig sind, sowie welche, die lediglich zu anonymen Statistikzwecken (Google Analytics) genutzt werden. Sie können selbst entscheiden, ob Sie letztere zulassen möchten. Sie können Ihre Einstellung jederzeit in der Datenschutzerklärung widerrufen. Weitere Informationen finden Sie in unseren Datenschutzhinweisen.